Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
601 W FLORES ST
Address NEW:
601 W FLORES ST
Apply Date:
11/05/2026
Applicant:
Cox Communications
Description:
PRJ317696-1: Cox to trench 47' to install new CATV conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-1126-01925
Permit Status: In review
Permit Description: PRJ317696-1: Cox to trench 47' to install new CATV conduit for system tie.
Start Date Submittal Complete Date Status  
11/08/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1126-01925
Permit Status: In review
Permit Description: PRJ317696-1: Cox to trench 47' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
Date Name
11/09/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
11/09/2026 Local Street Pavement Moratorium [Street name] is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting.
11/09/2026 Traffic Control set-up approved between 7AM - 5PM