Permit Details

Status:
Fees Paid
Type:
Right-of-Way (ROW) - Utility
Apply Date:
11/04/2026
Applicant:
Angeline Trejo
Description:
Access to one handhole and one pedestal for fiber optic cable placing & splicing; place 260’ of fiber cable thru EXISTING CONDUIT, no excavation work. “This project is for Lumen and will not be conveyed to any other company.”

Permit Reviews

Permit Number - TR-UTL-1126-01909
Permit Status: Fees paid
Permit Description: Access to one handhole and one pedestal for fiber optic cable placing & splicing; place 260’ of fiber cable thru EXISTING CONDUIT, no excavation work. “This project is for Lumen and will not be conveyed to any other company.”
Start Date Submittal Complete Date Status  
11/18/2026 RIGHT-OF-WAY REVIEW v.2 11/19/2026 APPROVED Review Details
11/05/2026 RIGHT-OF-WAY REVIEW v.1 11/18/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1126-01909
Permit Status: Fees paid
Permit Description: Access to one handhole and one pedestal for fiber optic cable placing & splicing; place 260’ of fiber cable thru EXISTING CONDUIT, no excavation work. “This project is for Lumen and will not be conveyed to any other company.”
Total Outstanding Activity Conditions - 6
Date Name
11/09/2026 Traffic control set-up approved between 9AM - 3:30PM
11/09/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
11/09/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
11/09/2026 PROOF OF NOTIFICATION IS REQUIRED. AT THE TIME OF THE PRECONSTRUCTION MEETING
11/19/2026 Continuous Pedestrian Access Continuous ADA-compliant pedestrian access shall be maintained at all times. If a sidewalk is closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. Worker-Assisted Pedestrian Access The sidewalk shall remain open and ADA compliant at all times during construction. Crew- or worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented before the sidewalk is closed.
11/19/2026 Traffic Control Devices and Daily Removal Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.

Documents

File Name Document Type  
DESIGN PLAN-E.1600.0034116_SATELLITE_PLAN-C1_V1.PDF DOCUMENTS VIEW
E.1600.0034116_CAD_10312026_TUCSON_V1.PDF DOCUMENTS VIEW
QWS34117 REVISED_V2.PDF DOCUMENTS VIEW