Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2424 W SWEETWATER DR
Apply Date:
11/30/2025
Applicant:
Cox Communications
Description:
PRJ298977-1 cox to trench 10' to install new conduit for system tie. - (Job previously approved under permit#TR-UTL-0725-01180)

Permit Reviews

Permit Number - TR-UTL-1125-02026
Permit Status: Complete
Permit Description: PRJ298977-1 cox to trench 10' to install new conduit for system tie. - (Job previously approved under permit#TR-UTL-0725-01180)
Start Date Submittal Complete Date Status  
12/01/2025 RIGHT-OF-WAY REVIEW v.1 12/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1125-02026
Permit Status: Complete
Permit Description: PRJ298977-1 cox to trench 10' to install new conduit for system tie. - (Job previously approved under permit#TR-UTL-0725-01180)
Total Outstanding Activity Conditions - 3
Date Name
12/02/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact HistoricPreservationOffice@tucson.onmicrosoft.com**
12/02/2025 PRE-CON/SIDEWALK
12/02/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1125-02026
Permit Description: PRJ298977-1 cox to trench 10' to install new conduit for system tie. - (Job previously approved under permit#TR-UTL-0725-01180)
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/13/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/25/2026 TRSP - ROW - Backfill - Placement/Compaction Passed All work in the dirt no work on a pole. All work complete.
03/25/2026 TRSP - ROW - Final Passed All work in the dirt no work on a pole. All work complete.