Permit: TR-UTL-1125-02010
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9447 E BENCH MARK LP
Address NEW:
9447 E BENCH MARK LP
Apply Date:
11/24/2025
Applicant:
ANGEL MORALES
Description:
Wo#3164441 9447 E Bench Mark Loop 15-15-22 ne leaking main at the front north side of the lot in asphalt 8lf/ar
Permit Reviews
Permit Number - TR-UTL-1125-02010
Permit Status: Complete
Permit Description: Wo#3164441 9447 E Bench Mark Loop 15-15-22 ne leaking main at the front north side of the lot in asphalt 8lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/25/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1125-02010
Permit Status: Complete
Permit Description: Wo#3164441 9447 E Bench Mark Loop 15-15-22 ne leaking main at the front north side of the lot in asphalt 8lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/25/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 11/25/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1125-02010
Permit Description: Wo#3164441 9447 E Bench Mark Loop 15-15-22 ne leaking main at the front north side of the lot in asphalt 8lf/ar
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2025 | TRSP - ROW - Final | Passed | Work is complete and final pavement repair is in place |