Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
145 S Olsen AV
Address NEW:
145 S Olsen AV
Apply Date:
11/20/2025
Applicant:
Ilana Galluzzo
Description:
4' x 6' BELL HOLE IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-1125-01997
Permit Status: Complete
Permit Description: 4' x 6' BELL HOLE IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Start Date Submittal Complete Date Status  
11/20/2025 RIGHT-OF-WAY REVIEW v.1 11/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1125-01997
Permit Status: Complete
Permit Description: 4' x 6' BELL HOLE IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
Date Name
11/21/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/21/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1125-01997
Permit Description: 4' x 6' BELL HOLE IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/26/2026 TRSP - ROW - Barricade - Setup/Routine Passed
01/26/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/26/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
01/26/2026 TRSP - ROW - Final Passed