Permit: TR-UTL-1125-01990
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
105 N MOUNTAIN VIEW AV
Address NEW:
105 N MOUNTAIN VIEW AV
Apply Date:
11/18/2025
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Vertical Drilling and minor excavation for cathodic protection well replacement. This work is associated with critical pipeline maintenance.
Permit Reviews
Permit Number - TR-UTL-1125-01990
Permit Status: Complete
Permit Description: Vertical Drilling and minor excavation for cathodic protection well replacement. This work is associated with critical pipeline maintenance.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/20/2025 | REQUIRES RESUBMIT |
| 11/24/2025 | RIGHT-OF-WAY REVIEW v.2 | 11/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1125-01990
Permit Status: Complete
Permit Description: Vertical Drilling and minor excavation for cathodic protection well replacement. This work is associated with critical pipeline maintenance.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/19/2025 | ALLEY |
| 11/19/2025 | PRE-CON/SIDEWALK |
| 11/19/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 11/24/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1125-01990
Permit Description: Vertical Drilling and minor excavation for cathodic protection well replacement. This work is associated with critical pipeline maintenance.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/19/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/19/2025 | TRSP - ROW - Final | Passed |