Permit: TR-UTL-1125-01985
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5655 E 29TH ST BLDG 1
Address NEW:
5655 E 29TH ST BLDG 1
Apply Date:
11/18/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 5-1" water services with meter and box
Permit Reviews
Permit Number - TR-UTL-1125-01985
Permit Status: Complete
Permit Description: Installing 5-1" water services with meter and box
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/01/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/02/2025 | APPROVED |
| 11/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1125-01985
Permit Status: Complete
Permit Description: Installing 5-1" water services with meter and box
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 11/18/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 11/18/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 24TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 11/18/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/18/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 12/01/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 12/01/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 12/01/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1125-01985
Permit Description: Installing 5-1" water services with meter and box
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control is set up according to an approved traffic control plan | |
| 01/07/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 01/07/2026 | TRSP - ROW - Final | Passed | Work is complete and final pavement repair is in place | |
| 12/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Site is ready for work to begin, locates have aready been completed. Tricon is well aware of city of Tucsons pavement patch requirements. |