Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1051 E SENECA ST
Address NEW:
1051 E SENECA ST
Apply Date:
11/13/2025
Applicant:
Sarah Latimer
Description:
EXCAVATING A 10X3 TRENCH AT 1051 E SENECA ST TO REPLACE GAS SERVICE IN ROW IN SIDEWALK AND DIRT. TRENCH WILL BE LOCATED APPROX 10' SOUTH OF SOUTH P/L AND 12' WEST OF EAST P/L.

Permit Reviews

Permit Number - TR-UTL-1125-01975
Permit Status: Issued
Permit Description: EXCAVATING A 10X3 TRENCH AT 1051 E SENECA ST TO REPLACE GAS SERVICE IN ROW IN SIDEWALK AND DIRT. TRENCH WILL BE LOCATED APPROX 10' SOUTH OF SOUTH P/L AND 12' WEST OF EAST P/L.
Start Date Submittal Complete Date Status  
11/13/2025 RIGHT-OF-WAY REVIEW v.1 11/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1125-01975
Permit Status: Issued
Permit Description: EXCAVATING A 10X3 TRENCH AT 1051 E SENECA ST TO REPLACE GAS SERVICE IN ROW IN SIDEWALK AND DIRT. TRENCH WILL BE LOCATED APPROX 10' SOUTH OF SOUTH P/L AND 12' WEST OF EAST P/L.
Total Outstanding Activity Conditions - 5
Date Name
11/14/2025 Traffic Control set-up approved between 7AM - 5PM
11/14/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
11/14/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.
11/17/2025 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
11/17/2025 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
1051 E SENECA ST_V1.PDF DOCUMENTS VIEW