Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2034 S AMALIA AV
Address NEW:
2034 S AMALIA AV
Apply Date:
11/10/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE (MAY I GET A 60 DAY PERMIT)

Permit Reviews

Permit Number - TR-UTL-1125-01952
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE (MAY I GET A 60 DAY PERMIT)
Start Date Submittal Complete Date Status  
11/10/2025 RIGHT-OF-WAY REVIEW v.1 11/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1125-01952
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE (MAY I GET A 60 DAY PERMIT)
Total Outstanding Activity Conditions - 2
Date Name
11/10/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/10/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1125-01952
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE (MAY I GET A 60 DAY PERMIT)
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/13/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
12/16/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
01/23/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
2034 S AMALIA AVE AIREAL_V1.PDF DOCUMENTS VIEW
2034 S AMALIA AVE SITE_V1.PDF DOCUMENTS VIEW
2034 S AMALIA AVE TCP_V1.PDF DOCUMENTS VIEW