Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
6235 E BROADWAY BL
Apply Date:
11/10/2025
Applicant:
Angeline Trejo
Description:
01/26/2026- change narrative for 01/2026: Access MH 12787 for placing cable & splicing; dig pit,intercept existing conduit in driveway, then bore 121’ and place innerduct and a 3048 handhole. 01/26/2026-change narrative for 12/2025: The traffic control plan has been revised to reflect that the MH is located at the edge of the bus lane and right travel lane; use of the right lane is required to safely complete the work. P.354537 - 1 PED, 2 PITS, 149' BORING, 32' REMOVE/REPLACE ASPHALT, AND 76' TRENCHING 12/03/2025 - Request for 90 Day Renewal as of 12/13/2025

Permit Reviews

Permit Number - TR-UTL-1125-01950
Permit Status: Complete
Permit Description: 01/26/2026- change narrative for 01/2026: Access MH 12787 for placing cable & splicing; dig pit,intercept existing conduit in driveway, then bore 121’ and place innerduct and a 3048 handhole. 01/26/2026-change narrative for 12/2025: The traffic control plan has been revised to reflect that the MH is located at the edge of the bus lane and right travel lane; use of the right lane is required to safely complete the work. P.354537 - 1 PED, 2 PITS, 149' BORING, 32' REMOVE/REPLACE ASPHALT, AND 76' TRENCHING 12/03/2025 - Request for 90 Day Renewal as of 12/13/2025
Start Date Submittal Complete Date Status  
11/25/2025 RIGHT-OF-WAY REVIEW REVISION v.1 12/01/2025 APPROVED Review Details
11/10/2025 RIGHT-OF-WAY REVIEW v.1 11/10/2025 APPROVED Review Details
01/16/2026 RIGHT-OF-WAY REVIEW REVISION v.1 01/21/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1125-01950
Permit Status: Complete
Permit Description: 01/26/2026- change narrative for 01/2026: Access MH 12787 for placing cable & splicing; dig pit,intercept existing conduit in driveway, then bore 121’ and place innerduct and a 3048 handhole. 01/26/2026-change narrative for 12/2025: The traffic control plan has been revised to reflect that the MH is located at the edge of the bus lane and right travel lane; use of the right lane is required to safely complete the work. P.354537 - 1 PED, 2 PITS, 149' BORING, 32' REMOVE/REPLACE ASPHALT, AND 76' TRENCHING 12/03/2025 - Request for 90 Day Renewal as of 12/13/2025
Total Outstanding Activity Conditions - 7
Date Name
11/10/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/10/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
11/10/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
11/10/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/10/2025 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/10/2025 Traffic control set-up approved between 9AM - 3:30PM
11/10/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1125-01950
Permite Description: 01/26/2026- change narrative for 01/2026: Access MH 12787 for placing cable & splicing; dig pit,intercept existing conduit in driveway, then bore 121’ and place innerduct and a 3048 handhole. 01/26/2026-change narrative for 12/2025: The traffic control plan has been revised to reflect that the MH is located at the edge of the bus lane and right travel lane; use of the right lane is required to safely complete the work. P.354537 - 1 PED, 2 PITS, 149' BORING, 32' REMOVE/REPLACE ASPHALT, AND 76' TRENCHING 12/03/2025 - Request for 90 Day Renewal as of 12/13/2025
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/12/2025 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
12/12/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
12/12/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1125-01950
Permit Description: 01/26/2026- change narrative for 01/2026: Access MH 12787 for placing cable & splicing; dig pit,intercept existing conduit in driveway, then bore 121’ and place innerduct and a 3048 handhole. 01/26/2026-change narrative for 12/2025: The traffic control plan has been revised to reflect that the MH is located at the edge of the bus lane and right travel lane; use of the right lane is required to safely complete the work. P.354537 - 1 PED, 2 PITS, 149' BORING, 32' REMOVE/REPLACE ASPHALT, AND 76' TRENCHING 12/03/2025 - Request for 90 Day Renewal as of 12/13/2025
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/06/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/12/2026 TRSP - ROW - Barricade - Setup/Routine Passed
03/11/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
03/11/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
P.354537 NARRATIVE_V1.PDF DOCUMENTS VIEW
REVISED-P.354537-CIVIL PERMIT_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
P.354537-TUCSON-REVISION NARRATIVE TCP_V1.PDF DOCUMENTS VIEW
P.354537-TUCSON-TCP-FISH35331_V1.PDF DOCUMENTS VIEW
P.354537-CIVIL PERMIT 11-06-25_V1.PDF DOCUMENTS VIEW
P.354537-TUCSON-TCP-QWS33406_V1.PDF DOCUMENTS VIEW