Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1125-01926
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6072 S SWEET BIRCH LN
Address NEW:
6072 S SWEET BIRCH LN
Apply Date:
11/04/2025
Applicant:
ANGEL MORALES
Description:
Wo#3155556 6072 s sweet birch ln 15-15-12 nw repair service at the front north side of the lot in asphalt 6lf/ar
Permit Reviews
Permit Number - TR-UTL-1125-01926
Permit Status: Complete
Permit Description: Wo#3155556 6072 s sweet birch ln 15-15-12 nw repair service at the front north side of the lot in asphalt 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/04/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1125-01926
Permit Status: Complete
Permit Description: Wo#3155556 6072 s sweet birch ln 15-15-12 nw repair service at the front north side of the lot in asphalt 6lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/04/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 11/04/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1125-01926
Permit Description: Wo#3155556 6072 s sweet birch ln 15-15-12 nw repair service at the front north side of the lot in asphalt 6lf/ar
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2025 | TRSP - ROW - Final | Passed | Work was completed under an emergency permit |