Permit: TR-UTL-1124-02196
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4314 E ELMWOOD ST
Address NEW:
4314 E ELMWOOD ST
Apply Date:
11/20/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN DIRT ROW ALONG WITH 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 4314 E ELMWOOD ST
Permit Reviews
Permit Number - TR-UTL-1124-02196
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN DIRT ROW ALONG WITH 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 4314 E ELMWOOD ST
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1124-02196
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN DIRT ROW ALONG WITH 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 4314 E ELMWOOD ST
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/21/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 11/21/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1124-02196
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN DIRT ROW ALONG WITH 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 4314 E ELMWOOD ST
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/26/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | underground work completed, barricades already taken down | |
| 01/06/2025 | TRSP - ROW - Final | Passed |