Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8300 E TANQUE VERDE RD
Apply Date:
11/18/2024
Applicant:
Eric Wieduwilt
Description:
Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.

Permit Reviews

Permit Number - TR-UTL-1124-02182
Permit Status: Complete
Permit Description: Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.
Start Date Submittal Complete Date Status  
11/18/2024 RIGHT-OF-WAY REVIEW v.1 12/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1124-02182
Permit Status: Complete
Permit Description: Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.
Total Outstanding Activity Conditions - 6
Date Name
11/18/2024 PRE-CON/PAVEMENT/SIDEWALK
11/18/2024 Traffic control set-up approved between 9AM - 3:30PM
11/18/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
12/16/2024 The following extended traffic control set-up times were approved: 24 hours
12/16/2024 Night work
12/16/2024 Prior to disturbing COT owned irrigation Contact Eric Ross at Eric.Ross@tucsonaz.gov Prior to disturbing any landscaping/vegetation in the right-of-way Contact David Marhefka at (520) 403-5074 david.marhefka@tucsonaz.gov

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1124-02182
Permit Description: Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/09/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/09/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
04/09/2025 TRSP - ROW - Final Passed
04/09/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
APPROVED OFFSITE PUBLIC SEWER PLANS (P24SC0008) (COT ROW)_V1.PDF DOCUMENTS VIEW
E TANQUE VERDE RD. TCP (COT ROW)_V1.PDF DOCUMENTS VIEW