Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7082 E CALLE BETELGEUX
Apply Date:
11/12/2024
Applicant:
Cox Communications
Description:
PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.

Permit Reviews

Permit Number - TR-UTL-1124-02148
Permit Status: Complete
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Start Date Submittal Complete Date Status  
11/13/2024 RIGHT-OF-WAY REVIEW v.1 11/14/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1124-02148
Permit Status: Complete
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Total Outstanding Activity Conditions - 3
Date Name
11/13/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
11/13/2024 Traffic control set-up approved between 9AM - 3:30PM
11/13/2024 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1124-02148
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/02/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed awaiting bluestake ticket to resolve, next inspection will be barricade set up
12/11/2024 TRSP - ROW - Barricade - Setup/Routine Passed Alleyway closed off for aerial work, trash service, not scheduled until Thursday, crew will be done by then
12/20/2024 TRSP - ROW - Backfill - Placement/Compaction Passed Landscape backfilled around new riser, checked and approved
02/25/2025 TRSP - ROW - Final Passed all prior inspections passed, traffic control removed, job completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ281720-1 - TUCSON_V1.PDF DOCUMENTS VIEW
PRJ281720-1_TCP_V1.PDF DOCUMENTS VIEW
PRJ281720-1_TUCSON AERIAL_V1.PDF DOCUMENTS VIEW