Permit: TR-UTL-1124-02148
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7082 E CALLE BETELGEUX
Address NEW:
7082 E CALLE BETELGEUX
Apply Date:
11/12/2024
Applicant:
Cox Communications
Description:
PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Permit Reviews
Permit Number - TR-UTL-1124-02148
Permit Status: Complete
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1124-02148
Permit Status: Complete
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/13/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 11/13/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/13/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1124-02148
Permit Description: PRJ281720-1: Cox to trench 16' to install CATV conduit and place vault for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | awaiting bluestake ticket to resolve, next inspection will be barricade set up | |
| 12/11/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | Alleyway closed off for aerial work, trash service, not scheduled until Thursday, crew will be done by then | |
| 12/20/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Landscape backfilled around new riser, checked and approved | |
| 02/25/2025 | TRSP - ROW - Final | Passed | all prior inspections passed, traffic control removed, job completed |