Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1124-02109
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
745 E DRACHMAN ST
Address NEW:
745 E DRACHMAN ST
Apply Date:
11/05/2024
Applicant:
Ilana Galluzzo
Description:
POTHOLING TO VERIFY PIPE DEPTH AND SIZE AT DRACHMAN ST & N EUCLID AVE INTERSECTION- See Design 1 - Pothole water meter to verify depth - Station 61+11, 11' South of the curb. 2 - Pothole water meter to verify depth - Station 61+79, 11' South of the curb. 3 - Pothole water meter to verify depth - Station 62+26, 11' South of the curb. 4 - Pothole gas line to verify depth - Station 62+59, 11' South of the curb. 5 - Pothole water meter to verify depth - Station 62+96, 11' South of the curb.
Permit Reviews
Permit Number - TR-UTL-1124-02109
Permit Status: Complete
Permit Description: POTHOLING TO VERIFY PIPE DEPTH AND SIZE AT DRACHMAN ST & N EUCLID AVE INTERSECTION- See Design
1 - Pothole water meter to verify depth - Station 61+11, 11' South of the curb.
2 - Pothole water meter to verify depth - Station 61+79, 11' South of the curb.
3 - Pothole water meter to verify depth - Station 62+26, 11' South of the curb.
4 - Pothole gas line to verify depth - Station 62+59, 11' South of the curb.
5 - Pothole water meter to verify depth - Station 62+96, 11' South of the curb.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1124-02109
Permit Status: Complete
Permit Description: POTHOLING TO VERIFY PIPE DEPTH AND SIZE AT DRACHMAN ST & N EUCLID AVE INTERSECTION- See Design
1 - Pothole water meter to verify depth - Station 61+11, 11' South of the curb.
2 - Pothole water meter to verify depth - Station 61+79, 11' South of the curb.
3 - Pothole water meter to verify depth - Station 62+26, 11' South of the curb.
4 - Pothole gas line to verify depth - Station 62+59, 11' South of the curb.
5 - Pothole water meter to verify depth - Station 62+96, 11' South of the curb.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/05/2024 | BUS STOP/ ROUTE |
| 11/05/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 11/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1124-02109
Permit Description: POTHOLING TO VERIFY PIPE DEPTH AND SIZE AT DRACHMAN ST & N EUCLID AVE INTERSECTION- See Design
1 - Pothole water meter to verify depth - Station 61+11, 11' South of the curb.
2 - Pothole water meter to verify depth - Station 61+79, 11' South of the curb.
3 - Pothole water meter to verify depth - Station 62+26, 11' South of the curb.
4 - Pothole gas line to verify depth - Station 62+59, 11' South of the curb.
5 - Pothole water meter to verify depth - Station 62+96, 11' South of the curb.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/06/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/06/2025 | TRSP - ROW - Final | Passed |