Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
11/13/2023
Applicant:
Robert Reynolds
Description:
7854 E WRIGHTSTOWN RD (ALLEY) 3X6 BELLHOLE IN DIRT AND2X10 TRENCH IN DIRT TO REPLACE GAS LINE

Permit Reviews

Permit Number - TR-UTL-1123-02918
Permit Status: Complete
Permit Description: 7854 E WRIGHTSTOWN RD (ALLEY) 3X6 BELLHOLE IN DIRT AND2X10 TRENCH IN DIRT TO REPLACE GAS LINE
Start Date Submittal Complete Date Status  
11/14/2023 RIGHT-OF-WAY REVIEW v.1 11/14/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1123-02918
Permit Status: Complete
Permit Description: 7854 E WRIGHTSTOWN RD (ALLEY) 3X6 BELLHOLE IN DIRT AND2X10 TRENCH IN DIRT TO REPLACE GAS LINE
Total Outstanding Activity Conditions - 3
Date Name
03/29/2023 This site has been reviewed by Tucson Water in a preapplication and requires Tucson Water review. Add Tucson Water New Area Development to any Development Packages proposed at this site.
11/14/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
11/14/2023 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1123-02918
Permite Description: 7854 E WRIGHTSTOWN RD (ALLEY) 3X6 BELLHOLE IN DIRT AND2X10 TRENCH IN DIRT TO REPLACE GAS LINE
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/16/2023 TRSP - ROW - Final/Close-Out N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1123-02918
Permit Description: 7854 E WRIGHTSTOWN RD (ALLEY) 3X6 BELLHOLE IN DIRT AND2X10 TRENCH IN DIRT TO REPLACE GAS LINE
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/16/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/03/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW