Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1123-02916
Permit Details
Apply Date:
11/13/2023
Applicant:
Tucson Electric Power
Description:
WO T93644 - TEP REPLACING EXISTING POLES WITH 40' STEEL POLES (RED CIRCLES), AND WORKING ON EXISTING POLE (YELLOW CIRCLE) TO BRING CONSTRUCTION AND VOLTAGE UP STANDARDS AND MAKE READY FOR NEW DUPLEXES
Permit Reviews
Permit Number - TR-UTL-1123-02916
Permit Status: Issued
Permit Description: WO T93644 - TEP REPLACING EXISTING POLES WITH 40' STEEL POLES (RED CIRCLES), AND WORKING ON EXISTING POLE (YELLOW CIRCLE) TO BRING CONSTRUCTION AND VOLTAGE UP STANDARDS AND MAKE READY FOR NEW DUPLEXES
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/14/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/14/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1123-02916
Permit Status: Issued
Permit Description: WO T93644 - TEP REPLACING EXISTING POLES WITH 40' STEEL POLES (RED CIRCLES), AND WORKING ON EXISTING POLE (YELLOW CIRCLE) TO BRING CONSTRUCTION AND VOLTAGE UP STANDARDS AND MAKE READY FOR NEW DUPLEXES
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
11/14/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
11/14/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-1123-02916
Permit Description: WO T93644 - TEP REPLACING EXISTING POLES WITH 40' STEEL POLES (RED CIRCLES), AND WORKING ON EXISTING POLE (YELLOW CIRCLE) TO BRING CONSTRUCTION AND VOLTAGE UP STANDARDS AND MAKE READY FOR NEW DUPLEXES
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
03/20/2024 | TRSP - ROW - Final/Close-Out | Passed |