Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3800 N 1ST AV
Address NEW:
3800 N 1ST AV
Apply Date:
11/13/2023
Applicant:
Cox Communications
Description:
PRJ258595-1 COX TO BORE 135' AND OVERLASH 148' FOR CATV CONDUIT FOR SYSTEM TIE

Permit Reviews

Permit Number - TR-UTL-1123-02914
Permit Status: Complete
Permit Description: PRJ258595-1 COX TO BORE 135' AND OVERLASH 148' FOR CATV CONDUIT FOR SYSTEM TIE
Start Date Submittal Complete Date Status  
11/14/2023 RIGHT-OF-WAY REVIEW v.1 11/15/2023 REQUIRES RESUBMIT Review Details
01/04/2024 RIGHT-OF-WAY REVIEW v.3 01/25/2024 APPROVED Review Details
12/04/2023 RIGHT-OF-WAY REVIEW v.2 12/27/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1123-02914
Permit Status: Complete
Permit Description: PRJ258595-1 COX TO BORE 135' AND OVERLASH 148' FOR CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 3
Date Name
11/14/2023 BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
11/14/2023 Traffic control set-up approved between 9AM - 3:30PM
11/14/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1123-02914
Permite Description: PRJ258595-1 COX TO BORE 135' AND OVERLASH 148' FOR CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/12/2024 TRSP - ROW - Field Change Request N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1123-02914
Permit Description: PRJ258595-1 COX TO BORE 135' AND OVERLASH 148' FOR CATV CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/08/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/07/2024 TRSP - ROW - Final/Close-Out Passed
05/07/2024 TRSP - ROW - Field Change Request Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ258595-1 REVISED TCP._V2.PDF DOCUMENTS VIEW
PRJ258595-1 REVISED TCP_V1.PDF DOCUMENTS VIEW
PRJ258595-1 REVISED TCP_V2.PDF DOCUMENTS VIEW
PRJ258595-1 TUCSON_V1.PDF DOCUMENTS VIEW