Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2309 N COLUMBUS BL
Apply Date:
11/06/2023
Applicant:
Desert Barricades LLC
Description:
WO T26158 - Columbus Rd from Grant Road South to Linden Street both North and South Side – TEP will be working in right-of-way to change out equipment on existing poles. Lane closure required.

Permit Reviews

Permit Number - TR-UTL-1123-02875
Permit Status: Complete
Permit Description: WO T26158 - Columbus Rd from Grant Road South to Linden Street both North and South Side – TEP will be working in right-of-way to change out equipment on existing poles. Lane closure required.
Start Date Submittal Complete Date Status  
11/07/2023 RIGHT-OF-WAY REVIEW v.1 11/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1123-02875
Permit Status: Complete
Permit Description: WO T26158 - Columbus Rd from Grant Road South to Linden Street both North and South Side – TEP will be working in right-of-way to change out equipment on existing poles. Lane closure required.
Total Outstanding Activity Conditions - 3
Date Name
11/07/2023 bus route/stop
11/07/2023 Traffic control set-up approved between 9AM - 3:30PM
11/07/2023 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1123-02875
Permit Description: WO T26158 - Columbus Rd from Grant Road South to Linden Street both North and South Side – TEP will be working in right-of-way to change out equipment on existing poles. Lane closure required.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/09/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/20/2024 TRSP - ROW - SITE INSPECTION Passed
02/20/2024 TRSP - ROW - Final/Close-Out Passed