Permit: TR-UTL-1123-02855
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6541 E FAYETTE ST
Address NEW:
6541 E FAYETTE ST
Apply Date:
11/01/2023
Applicant:
Cameron Bonner
Description:
323035 Site 2 and 3 - Install Approximately 521 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 7250-03, 7250-02, and 7250-01 per PCRWRD standard detail 211
Permit Reviews
Permit Number - TR-UTL-1123-02855
Permit Status: Complete
Permit Description: 323035 Site 2 and 3 - Install Approximately 521 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 7250-03, 7250-02, and 7250-01 per PCRWRD standard detail 211
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2023 | RIGHT-OF-WAY REVIEW v.2 | 11/08/2023 | APPROVED |
| 11/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/02/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1123-02855
Permit Status: Complete
Permit Description: 323035 Site 2 and 3 - Install Approximately 521 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 7250-03, 7250-02, and 7250-01 per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/02/2023 | Traffic Control set-up approved between 7AM - 5PM |
| 11/08/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1123-02855
Permit Description: 323035 Site 2 and 3 - Install Approximately 521 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 7250-03, 7250-02, and 7250-01 per PCRWRD standard detail 211
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2024 | TRSP - ROW - Notice of Completion | Passed |