Permit: TR-UTL-1123-02854
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6955 E LOLA PL
Address NEW:
6955 E LOLA PL
Apply Date:
11/01/2023
Applicant:
Cameron Bonner
Description:
323035 Site 1 - Remove and replace 5FT of fractured pipe with 5FT of 8" PVC located at 30FT and 234FT from MH 7246-12. Install Approximately 291 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 7246-12 and MH 7246-06 per PCRWRD standard detail 211, and a manhole bench rehabilitation will be completed on MH 7246-06
Permit Reviews
Permit Number - TR-UTL-1123-02854
Permit Status: Complete
Permit Description: 323035 Site 1 - Remove and replace 5FT of fractured pipe with 5FT of 8" PVC located at 30FT and 234FT from MH 7246-12. Install Approximately 291 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 7246-12 and MH 7246-06 per PCRWRD standard detail 211, and a manhole bench rehabilitation will be completed on MH 7246-06
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1123-02854
Permit Status: Complete
Permit Description: 323035 Site 1 - Remove and replace 5FT of fractured pipe with 5FT of 8" PVC located at 30FT and 234FT from MH 7246-12. Install Approximately 291 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 7246-12 and MH 7246-06 per PCRWRD standard detail 211, and a manhole bench rehabilitation will be completed on MH 7246-06
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/01/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 11/01/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1123-02854
Permit Description: 323035 Site 1 - Remove and replace 5FT of fractured pipe with 5FT of 8" PVC located at 30FT and 234FT from MH 7246-12. Install Approximately 291 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 7246-12 and MH 7246-06 per PCRWRD standard detail 211, and a manhole bench rehabilitation will be completed on MH 7246-06
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2024 | TRSP - ROW - Final/Close-Out | Passed |