Permit: TR-UTL-1122-00332
Permit Details
Apply Date:
11/29/2022
Applicant:
Ricardo Yanez
Description:
Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Permit Reviews
Permit Number - TR-UTL-1122-00332
Permit Status: Complete
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/19/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/12/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-1122-00332
Permit Status: Complete
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Date | Description | Comments |
---|---|---|
01/09/2023 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. | |
01/09/2023 | Sun Tran | |
01/09/2023 | Traffic control set-up approved between 9AM - 3:30PM | |
01/09/2023 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1122-00332
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/03/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Met with Rick from Betterway contracting. Discussed barricades. Flaggers will be used. All work will be overhead except for tying into the vault. | |
04/27/2023 | TRSP - ROW - Final/Close-Out | Passed |