Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
440 S MAIN AV
Apply Date:
11/29/2022
Applicant:
Ricardo Yanez
Description:
Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave

Permit Reviews

Permit Number - TR-UTL-1122-00332
Permit Status: Complete
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Start Date Submittal Complete Date Status  
12/19/2022 RIGHT-OF-WAY REVIEW v.1 01/12/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1122-00332
Permit Status: Complete
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Date Description Comments
01/09/2023 Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell.
01/09/2023 Sun Tran
01/09/2023 Traffic control set-up approved between 9AM - 3:30PM
01/09/2023 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1122-00332
Permit Description: Place 3200 ft of fiber optic cable on existing power pole from 440 S Main ave east to southwest corner of 15th St and 4th Ave
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/03/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Met with Rick from Betterway contracting. Discussed barricades. Flaggers will be used. All work will be overhead except for tying into the vault.
04/27/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
440 S MAIN AVE-2-MODEL_V1.PDF DOCUMENTS VIEW
440 S MAIN AVE-3-MODEL_V1.PDF DOCUMENTS VIEW
440 S MAIN AVE-4-MODEL_V1.PDF DOCUMENTS VIEW
440 S MAIN AVE-MODEL-1_V1.PDF DOCUMENTS VIEW
440 S MAIN TCP_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW