Permit: TR-UTL-1122-00330
Permit Details
Apply Date:
11/29/2022
Applicant:
Fernando Soto
Description:
Pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as par of COT Houghton corridor improvement project.
Permit Reviews
Permit Number - TR-UTL-1122-00330
Permit Status: Complete
Permit Description: Pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as par of COT Houghton corridor improvement project.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/19/2022 | RIGHT-OF-WAY REVIEW v.1 | 12/23/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1122-00330
Permit Status: Complete
Permit Description: Pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as par of COT Houghton corridor improvement project.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/22/2022 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1122-00330
Permite Description: Pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as par of COT Houghton corridor improvement project.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1122-00330
Permit Description: Pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as par of COT Houghton corridor improvement project.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2023 | TRSP - ROW - Final/Close-Out | Passed |