Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
749 S 5TH AV
Apply Date:
11/17/2022
Applicant:
Bobby Robbins
Description:
EXCAVATING A 5X5 TRENCH AT 749 S 5TH AVE TO ABANDON GAS SERVICE IN ROW IN ASPHALT. TRENCH WILL BE LOCATED APPROX 2' SOUTH OF SOUTH P/L AND 14' WEST OF WEST P/L.

Permit Reviews

Permit Number - TR-UTL-1122-00288
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 749 S 5TH AVE TO ABANDON GAS SERVICE IN ROW IN ASPHALT. TRENCH WILL BE LOCATED APPROX 2' SOUTH OF SOUTH P/L AND 14' WEST OF WEST P/L.
Start Date Submittal Complete Date Status  
12/14/2022 RIGHT-OF-WAY REVIEW v.1 12/19/2022 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1122-00288
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 749 S 5TH AVE TO ABANDON GAS SERVICE IN ROW IN ASPHALT. TRENCH WILL BE LOCATED APPROX 2' SOUTH OF SOUTH P/L AND 14' WEST OF WEST P/L.
Date Description Comments
12/19/2022 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
12/19/2022 Traffic Control set-up approved between 7AM - 5PM
12/19/2022 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1122-00288
Permit Description: EXCAVATING A 5X5 TRENCH AT 749 S 5TH AVE TO ABANDON GAS SERVICE IN ROW IN ASPHALT. TRENCH WILL BE LOCATED APPROX 2' SOUTH OF SOUTH P/L AND 14' WEST OF WEST P/L.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/15/2023 TRSP - ROW - Final/Close-Out Passed
10/27/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/15/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW