Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
408 S 6TH AV
Address NEW:
408 S 6TH AV
Apply Date:
11/02/2022
Applicant:
National Barricade LLC.
Description:
EXCAVATING A 5X5 TRENCH AT 408 S 6TH AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX37' SOUTH OF NORTH P/L AND APPROX 5' WEST OF WEST P/L.

Permit Reviews

Permit Number - TR-UTL-1122-00144
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 408 S 6TH AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX37' SOUTH OF NORTH P/L AND APPROX 5' WEST OF WEST P/L.
Start Date Submittal Complete Date Status  
11/30/2022 RIGHT-OF-WAY REVIEW v.1 11/30/2022 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1122-00144
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 408 S 6TH AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX37' SOUTH OF NORTH P/L AND APPROX 5' WEST OF WEST P/L.
Date Description Comments
11/30/2022 ARCHEOLOGICAL SENSITIVITY ZONE
11/30/2022 OTHER WORK IN AREA

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1122-00144
Permite Description: EXCAVATING A 5X5 TRENCH AT 408 S 6TH AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX37' SOUTH OF NORTH P/L AND APPROX 5' WEST OF WEST P/L.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/01/2023 TRSP - ROW - Recurring N/A Complete (Recurring) Gas line repairs are complete. Temporary asphalt patch is in place, needs permanent restoration.
05/02/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Complete (Recurring)
05/02/2023 TRSP - ROW - Final/Close-Out N/A Complete (Recurring)