Permit: TR-UTL-1026-01880
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
2807 E 22ND ST
Address NEW:
2807 E 22ND ST
Apply Date:
10/29/2026
Applicant:
Arnulfo Quiroz
Description:
T178667 - Continuation of permit TR-UTL-0726-01086. The only work completed on the last permit was that holes were dug. Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
Permit Reviews
Permit Number - TR-UTL-1026-01880
Permit Status: In review
Permit Description: T178667 - Continuation of permit TR-UTL-0726-01086. The only work completed on the last permit was that holes were dug. Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/30/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01880
Permit Status: In review
Permit Description: T178667 - Continuation of permit TR-UTL-0726-01086. The only work completed on the last permit was that holes were dug. Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 11/02/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 11/02/2026 | Adjacent streets of work area are subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting. |
| 11/02/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/02/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 11/02/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal by logging into tdc-online.tucsonaz.gov |