Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2532 S HARRISON RD
Apply Date:
10/29/2026
Applicant:
eligio pena
Description:
5X5 BELL HOLE IN DIRT TO REPLACE GAS LINE.

Permit Reviews

Permit Number - TR-UTL-1026-01879
Permit Status: Inspections
Permit Description: 5X5 BELL HOLE IN DIRT TO REPLACE GAS LINE.
Start Date Submittal Complete Date Status  
10/29/2026 RIGHT-OF-WAY REVIEW v.1 11/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01879
Permit Status: Inspections
Permit Description: 5X5 BELL HOLE IN DIRT TO REPLACE GAS LINE.
Total Outstanding Activity Conditions - 6
Date Name
10/29/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination
10/29/2026 Traffic control set-up approved between 9AM - 3:30PM
11/02/2026
11/02/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
11/02/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
11/02/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1026-01879
Permit Description: 5X5 BELL HOLE IN DIRT TO REPLACE GAS LINE.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/04/2026 Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. Passed Site is ready for work to begin
11/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with NPL over the phone who confirmed that work will begin either Thursday of this week or Monday of next week. Work will be in the dirt with no impact to sidewalks and very minimal traffic control.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW