Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1204 N WINSTEL BL
Apply Date:
10/27/2026
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
HOUSE SERVICE REPAIR

Permit Reviews

Permit Number - TR-UTL-1026-01863
Permit Status: Issued
Permit Description: HOUSE SERVICE REPAIR
Start Date Submittal Complete Date Status  
10/28/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01863
Permit Status: Issued
Permit Description: HOUSE SERVICE REPAIR
Total Outstanding Activity Conditions - 4
Date Name
10/28/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
10/28/2026 Emergency – After the fact permit – a TCP was provided due to the nature of the work. Any legal questions related to this work shall be directed to Borderland Construction to address since DTM did not have an opportunity to review, approve or inspect work.
10/28/2026 Local Street Pavement Moratorium [Street name] is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting.
10/28/2026 Traffic Control set-up approved between 7AM - 5PM

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW