Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5502 E ALTA VISTA ST
Apply Date:
10/26/2026
Applicant:
Ilana Galluzzo
Description:
APPROX 2500 FEET OF 12 INCH STEEL IN JOINT TRENCH WITH 4 INCH PE - SWG PIPE REPLACEMENT PROJECT

Permit Reviews

Permit Number - TR-UTL-1026-01845
Permit Status: Needs resubmittal
Permit Description: APPROX 2500 FEET OF 12 INCH STEEL IN JOINT TRENCH WITH 4 INCH PE - SWG PIPE REPLACEMENT PROJECT
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 11/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01845
Permit Status: Needs resubmittal
Permit Description: APPROX 2500 FEET OF 12 INCH STEEL IN JOINT TRENCH WITH 4 INCH PE - SWG PIPE REPLACEMENT PROJECT
Total Outstanding Activity Conditions - 6
Date Name
10/30/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
10/30/2026 Traffic control set-up approved between 9AM - 3:30PM
10/30/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/30/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
10/30/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/30/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.