Permit: TR-UTL-1026-01821
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
1129 E 7TH ST
Address NEW:
1129 E 7TH ST
Apply Date:
10/21/2026
Applicant:
Cox Communications
Description:
PRJ321415-1 Cox to delash &overlash and pull through existing for CATV system tie
Permit Reviews
Permit Number - TR-UTL-1026-01821
Permit Status: In review
Permit Description: PRJ321415-1 Cox to delash &overlash and pull through existing for CATV system tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01821
Permit Status: In review
Permit Description: PRJ321415-1 Cox to delash &overlash and pull through existing for CATV system tie
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/23/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/23/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/23/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/23/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/23/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. |