Permit: TR-UTL-1026-01800
Permit Details
Apply Date:
10/16/2026
Applicant:
Cox Communications
Description:
PRJ323806-1: Cox to over lash/ attach 205' new CATV conduit aerial strand for system tie. (DTM ROW Review Note: All work to be Completed prior to Nov 23rd Holiday Road Restriction. Approved for 1 Day of Aerial Work)
Permit Reviews
Permit Number - TR-UTL-1026-01800
Permit Status: Issued
Permit Description: PRJ323806-1: Cox to over lash/ attach 205' new CATV conduit aerial strand for system tie.
(DTM ROW Review Note: All work to be Completed prior to Nov 23rd Holiday Road Restriction. Approved for 1 Day of Aerial Work)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01800
Permit Status: Issued
Permit Description: PRJ323806-1: Cox to over lash/ attach 205' new CATV conduit aerial strand for system tie.
(DTM ROW Review Note: All work to be Completed prior to Nov 23rd Holiday Road Restriction. Approved for 1 Day of Aerial Work)
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 10/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/20/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
| 10/26/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 10/26/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 72-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 72 business hours before beginning work to coordinate impacts. |
| 10/26/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 10/26/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/26/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/26/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |