Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
7923 E 3RD ST
Address NEW:
7923 E 3RD ST
Apply Date:
10/16/2026
Applicant:
Alex Dietz
Description:
JO 326X013 Sites 1 and 2 - Site 1: Remove cleanout 2753*01 and install new terminal manhole to allow the installation of Approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-02. Site 2: Remove cleanout 2753*02 and install new terminal manhole to allow the installation of approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-03. Rehab entire MH bench for MH 2753-02 and 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collars on MH 2753-02 and MH 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 211.

Permit Reviews

Permit Number - TR-UTL-1026-01794
Permit Status: Issued
Permit Description: JO 326X013 Sites 1 and 2 - Site 1: Remove cleanout 2753*01 and install new terminal manhole to allow the installation of Approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-02. Site 2: Remove cleanout 2753*02 and install new terminal manhole to allow the installation of approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-03. Rehab entire MH bench for MH 2753-02 and 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collars on MH 2753-02 and MH 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 211.
Start Date Submittal Complete Date Status  
10/19/2026 RIGHT-OF-WAY REVIEW v.1 10/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01794
Permit Status: Issued
Permit Description: JO 326X013 Sites 1 and 2 - Site 1: Remove cleanout 2753*01 and install new terminal manhole to allow the installation of Approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-02. Site 2: Remove cleanout 2753*02 and install new terminal manhole to allow the installation of approximately 141 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 2753-03. Rehab entire MH bench for MH 2753-02 and 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collars on MH 2753-02 and MH 2753-03 per PCRWRD Standard Specifications and Details for Construction Std. 211.
Total Outstanding Activity Conditions - 4
Date Name
10/20/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/20/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
10/20/2026 Traffic Control set-up approved between 7AM - 5PM
10/22/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
326X013 - SITE 1 AND 2 FMP MAP_V1.PDF DOCUMENTS VIEW
DB 73034 - SITE 1 - 7923 E 3RD ST - FOOTBALLS - 326X013_V1.PDF DOCUMENTS VIEW
DB 73034 - SITE 2 - 7923 E 3RD ST - FOOTBALLS - 326X013_V1.PDF DOCUMENTS VIEW
FMP FOR ELLISON MILLS 7923 E 3RD STREET JO326X013 1_V1.PDF DOCUMENTS VIEW