Permit: TR-UTL-1026-01793
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
752 N HAYDEN DR
Address NEW:
752 N HAYDEN DR
Apply Date:
10/16/2026
Applicant:
Alex Dietz
Description:
JO 326X012 Site 2 - Remove cleanout 2753*06 and install new terminal manhole to allow the installation of approximately 156LF of 8" Cured in Place Pipe between the new terminal manhole and manhole 2753-17. Rehab entire manhole bench for manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collar on manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 211.
Permit Reviews
Permit Number - TR-UTL-1026-01793
Permit Status: Issued
Permit Description: JO 326X012 Site 2 - Remove cleanout 2753*06 and install new terminal manhole to allow the installation of approximately 156LF of 8" Cured in Place Pipe between the new terminal manhole and manhole 2753-17. Rehab entire manhole bench for manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collar on manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 211.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01793
Permit Status: Issued
Permit Description: JO 326X012 Site 2 - Remove cleanout 2753*06 and install new terminal manhole to allow the installation of approximately 156LF of 8" Cured in Place Pipe between the new terminal manhole and manhole 2753-17. Rehab entire manhole bench for manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 302. Install concrete collar on manhole 2753-17 per PCRWRD Standard Specifications and Details for Construction Std. 211.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 10/20/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/20/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/20/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 10/22/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 10/22/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/23/2026 | The proposed permit work and traffic control plan has been reviewed for potential impacts to the Prop 411 Better Streets Roadway Improvement Program and falls within the Carriage Hill Neighborhood. The Prop 411 improvements in this specific area are planned for Phase 2 and not anticipated to begin until calendar year 2028. Providing this permit work is completed prior to 2028, it can be approved without conditions or conflicts with Prop 411." |