Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
6140 S DUNTON AV
Address NEW:
6140 S DUNTON AV
Apply Date:
10/14/2026
Applicant:
Adrien Pineda
Description:
**EMERGENCY ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)70'X2' TRENCH IN THE DIRT ROW AND (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS FOR 6140 S DUNTON AVE**

Permit Reviews

Permit Number - TR-UTL-1026-01780
Permit Status: Needs resubmittal
Permit Description: **EMERGENCY ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)70'X2' TRENCH IN THE DIRT ROW AND (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS FOR 6140 S DUNTON AVE**
Start Date Submittal Complete Date Status  
10/14/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01780
Permit Status: Needs resubmittal
Permit Description: **EMERGENCY ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)70'X2' TRENCH IN THE DIRT ROW AND (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS FOR 6140 S DUNTON AVE**
Total Outstanding Activity Conditions - 3
Date Name
10/15/2026 Traffic Control set-up approved between 7AM - 5PM
10/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
10/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.