Permit: TR-UTL-1026-01778
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
3000 E ELVIRA RD
Address NEW:
3000 E ELVIRA RD
Apply Date:
10/13/2026
Applicant:
Ilana Galluzzo
Description:
CREWS TO COMPLETE THE PAVEMENT RESTORATION IN ORDER TO CLOSE OUT PERMIT TR-UTL-0724-01318 - APPROX 5 WORKING DAYS IN ROW, APPROX 20 SQUARE YARDS IN PAVEMENT
Permit Reviews
Permit Number - TR-UTL-1026-01778
Permit Status: Fees due
Permit Description: CREWS TO COMPLETE THE PAVEMENT RESTORATION IN ORDER TO CLOSE OUT PERMIT TR-UTL-0724-01318 - APPROX 5 WORKING DAYS IN ROW, APPROX 20 SQUARE YARDS IN PAVEMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/19/2026 | REQUIRES RESUBMIT |
| 10/14/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/15/2026 | REQUIRES RESUBMIT |
| 10/25/2026 | RIGHT-OF-WAY REVIEW v.3 | 10/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01778
Permit Status: Fees due
Permit Description: CREWS TO COMPLETE THE PAVEMENT RESTORATION IN ORDER TO CLOSE OUT PERMIT TR-UTL-0724-01318 - APPROX 5 WORKING DAYS IN ROW, APPROX 20 SQUARE YARDS IN PAVEMENT
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/14/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/14/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/28/2026 | All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift. |
| 10/28/2026 | Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk. |
| 10/28/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period. |