Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1342 E 10TH ST
Address NEW:
1342 E 10TH ST
Apply Date:
10/09/2026
Applicant:
Description:
JO 326019 Site 1 - Site 1: Remove cleanout 9907*24 and install new terminal manhole to allow the installation of Approximately 377 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 9907-27. Bench rehabilitation will be completed on MH 9907-27.

Permit Reviews

Permit Number - TR-UTL-1026-01758
Permit Status: Issued
Permit Description: JO 326019 Site 1 - Site 1: Remove cleanout 9907*24 and install new terminal manhole to allow the installation of Approximately 377 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 9907-27. Bench rehabilitation will be completed on MH 9907-27.
Start Date Submittal Complete Date Status  
10/09/2026 RIGHT-OF-WAY REVIEW v.1 11/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01758
Permit Status: Issued
Permit Description: JO 326019 Site 1 - Site 1: Remove cleanout 9907*24 and install new terminal manhole to allow the installation of Approximately 377 LF of 8" Cured in Place Pipe between the new terminal manhole and MH 9907-27. Bench rehabilitation will be completed on MH 9907-27.
Total Outstanding Activity Conditions - 7
Date Name
10/14/2026 Traffic Control set-up approved between 7AM - 5PM
10/14/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
10/14/2026 please see attachments for storm to shade conditions.
11/02/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.
11/02/2026 If survey markers are damaged or disturbed during construction, the contractor shall have the markers reset by a registered land surveyor in accordance with Arizona Revised Statutes (A.R.S.) ยง 33-103.
11/02/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary.
11/02/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
326019 - SITE 1 FMP MAP (1342 E 10TH ST)_V1.PDF DOCUMENTS VIEW
DB 72998 - 1342 E 10TH ST - VARIOUS - 326X011_V1.PDF DOCUMENTS VIEW
JO 326019 PCRWRD APPROVAL LETTER_V1.PDF DOCUMENTS VIEW