Permit: TR-UTL-1026-01752
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
7673 E PALMA ST
Address NEW:
7673 E PALMA ST
Apply Date:
10/09/2026
Applicant:
Blair Montello
Description:
P-804663- (60-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Permit Reviews
Permit Number - TR-UTL-1026-01752
Permit Status: Fees due
Permit Description: P-804663- (60-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2026 | RIGHT-OF-WAY REVIEW v.1 | 11/04/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01752
Permit Status: Fees due
Permit Description: P-804663- (60-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/15/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/15/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/15/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/03/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |