Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1651 N CAMPBELL AV
Apply Date:
10/08/2026
Applicant:
Blair Montello
Description:
ACCESSING (1) EXISTING MH AND (1) EXISTING HH TO SPLICE FIBER. DIG 4X4 BORE PIT, LOCATE AND OVERSET WITH NEW 30X48 HH. HAND DIG NEW FIBER FROM EXISTING HH TO NEW 30X48 HH (5'). This project is for Lumen and will not be conveyed to any other company.

Permit Reviews

Permit Number - TR-UTL-1026-01750
Permit Status: Inspections
Permit Description: ACCESSING (1) EXISTING MH AND (1) EXISTING HH TO SPLICE FIBER. DIG 4X4 BORE PIT, LOCATE AND OVERSET WITH NEW 30X48 HH. HAND DIG NEW FIBER FROM EXISTING HH TO NEW 30X48 HH (5'). This project is for Lumen and will not be conveyed to any other company.
Start Date Submittal Complete Date Status  
11/02/2026 RIGHT-OF-WAY REVIEW v.3 11/04/2026 APPROVED Review Details
10/25/2026 RIGHT-OF-WAY REVIEW v.2 10/30/2026 REQUIRES RESUBMIT Review Details
10/08/2026 RIGHT-OF-WAY REVIEW v.1 10/16/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01750
Permit Status: Inspections
Permit Description: ACCESSING (1) EXISTING MH AND (1) EXISTING HH TO SPLICE FIBER. DIG 4X4 BORE PIT, LOCATE AND OVERSET WITH NEW 30X48 HH. HAND DIG NEW FIBER FROM EXISTING HH TO NEW 30X48 HH (5'). This project is for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 8
Date Name
10/12/2026 Traffic control set-up approved between 9AM - 3:30PM
11/04/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign
11/04/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 72-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 72 business hours before beginning work to coordinate impacts.
11/04/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
11/04/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/04/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/04/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/04/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1026-01750
Permit Description: ACCESSING (1) EXISTING MH AND (1) EXISTING HH TO SPLICE FIBER. DIG 4X4 BORE PIT, LOCATE AND OVERSET WITH NEW 30X48 HH. HAND DIG NEW FIBER FROM EXISTING HH TO NEW 30X48 HH (5'). This project is for Lumen and will not be conveyed to any other company.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/09/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work weekends after 9 AM on 17 November

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
E.1600.0033518_CAD_REV0_09302026_TUCSON_V1.PDF DOCUMENTS VIEW
E.1600.0033518_SATELLITE VIEW_TUCSON-D1_V1.PDF DOCUMENTS VIEW
QWS340271_V2_V2.PDF DOCUMENTS VIEW
QWS340272A_V3.PDF DOCUMENTS VIEW