Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Fees Paid
Type:
Right-of-Way (ROW) - Utility
Address:
1538 W PRINCE RD
Address NEW:
1538 W PRINCE RD
Apply Date:
10/06/2026
Applicant:
Cox Communications
Description:
PRJ319241-1: Cox to lash 654' of new CATV aerial strand & trench 63' to install new CATV conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-1026-01736
Permit Status: Fees paid
Permit Description: PRJ319241-1: Cox to lash 654' of new CATV aerial strand & trench 63' to install new CATV conduit for system tie.
Start Date Submittal Complete Date Status  
10/07/2026 RIGHT-OF-WAY REVIEW v.1 10/15/2026 REQUIRES RESUBMIT Review Details
10/25/2026 RIGHT-OF-WAY REVIEW v.2 10/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01736
Permit Status: Fees paid
Permit Description: PRJ319241-1: Cox to lash 654' of new CATV aerial strand & trench 63' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 5
Date Name
10/08/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination
10/08/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
10/08/2026 Traffic control set-up approved between 9AM - 3:30PM
10/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/08/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Documents

File Name Document Type  
PRJ319241-1 CITY OF TUCSON_V1.PDF DOCUMENTS VIEW
PRJ319241-1 REV TCP_V2.PDF DOCUMENTS VIEW
PRJ319241-1 TCP2_V1.PDF DOCUMENTS VIEW