Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1159 N CRAYCROFT RD
Apply Date:
10/06/2026
Applicant:
Ali Fermawi
Description:
Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions. This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.

Permit Reviews

Permit Number - TR-UTL-1026-01734
Permit Status: In review
Permit Description: Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions. This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.
Start Date Submittal Complete Date Status  
10/07/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01734
Permit Status: In review
Permit Description: Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions. This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.
Total Outstanding Activity Conditions - 4
Date Name
10/08/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
10/08/2026 Local Street Pavement Moratorium [Street name] is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting.
10/08/2026 Traffic control set-up approved between 9AM - 3:30PM
10/08/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.