Permit: TR-UTL-1026-01731
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2001 W STARR PASS BL
Address NEW:
2001 W STARR PASS BL
Apply Date:
10/05/2026
Applicant:
Cox Communications
Description:
PRJ319659-1: Cox to overlash 1,168' of existing CATV aerial strand, pull thru 128' of existing CATV conduit, trench 65' & bore 49' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-1026-01731
Permit Status: Issued
Permit Description: PRJ319659-1: Cox to overlash 1,168' of existing CATV aerial strand, pull thru 128' of existing CATV conduit, trench 65' & bore 49' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/25/2026 | APPROVED |
| 10/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/09/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01731
Permit Status: Issued
Permit Description: PRJ319659-1: Cox to overlash 1,168' of existing CATV aerial strand, pull thru 128' of existing CATV conduit, trench 65' & bore 49' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/22/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination |
| 10/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/23/2026 | Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones. |
| 10/23/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 10/23/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/23/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 10/23/2026 | Rolling shadow traffic control closures not to exceed 2 hrs in a single location, with onsite flaggers for right of way with less than 2 travel lanes in each direction. Closures that exceed 2 hrs will require full traffic control setups based on road configuration. |