Permit: TR-UTL-1026-01720
Permit Details
Status:
Fees Paid
Type:
Right-of-Way (ROW) - Utility
Address:
1909 S CRAYCROFT RD
Address NEW:
1909 S CRAYCROFT RD
Apply Date:
10/02/2026
Applicant:
Arnulfo Quiroz
Description:
T169928 - Replace (17) existing TEP/TELCO distribution poles, (6) downguys, OH conductors, OH attachments, and OH transformers in alleyways. Install (2) down guy assembly. Remove (1) TEP pole, OH conductors, and attachments. All to meet current TEP standards per Memo 2025C025- CORBETT NEIGHBORHOOD.
Permit Reviews
Permit Number - TR-UTL-1026-01720
Permit Status: Fees paid
Permit Description: T169928 - Replace (17) existing TEP/TELCO distribution poles, (6) downguys, OH conductors, OH attachments, and OH transformers in alleyways. Install (2) down guy assembly. Remove (1) TEP pole, OH conductors, and attachments. All to meet current TEP standards per Memo 2025C025- CORBETT NEIGHBORHOOD.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/02/2026 | RIGHT-OF-WAY REVIEW v.2 | 11/04/2026 | REQUIRES RESUBMIT |
| 11/18/2026 | RIGHT-OF-WAY REVIEW v.3 | 11/18/2026 | APPROVED |
| 10/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01720
Permit Status: Fees paid
Permit Description: T169928 - Replace (17) existing TEP/TELCO distribution poles, (6) downguys, OH conductors, OH attachments, and OH transformers in alleyways. Install (2) down guy assembly. Remove (1) TEP pole, OH conductors, and attachments. All to meet current TEP standards per Memo 2025C025- CORBETT NEIGHBORHOOD.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/08/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/08/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/08/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/08/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/04/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 11/04/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 11/04/2026 | Traffic Control set-up approved between 7AM - 5PM |