Permit: TR-UTL-1026-01708
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
10301 E EDNA PL
Address NEW:
10301 E EDNA PL
Apply Date:
10/02/2026
Applicant:
Angeline Trejo
Description:
N.795915 - 1 : ( PGS 3-8 ) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0126-00050
Permit Reviews
Permit Number - TR-UTL-1026-01708
Permit Status: In review
Permit Description: N.795915 - 1 : ( PGS 3-8 ) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT
Original Permit Approval on TR-UTL-0126-00050
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01708
Permit Status: In review
Permit Description: N.795915 - 1 : ( PGS 3-8 ) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT
Original Permit Approval on TR-UTL-0126-00050
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/09/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/09/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/09/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |