Permit: TR-UTL-1026-01702
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
1920 E AERO PARK BL
Address NEW:
1920 E AERO PARK BL
Apply Date:
10/01/2026
Applicant:
Cox Communications
Description:
Cox to trench 18', bore 1031' and new attach 2202' for catv commercial business tie. PERMIT FOR WORK ONLY WITH CITY OF TUCSON RIGHT OF WAY
Permit Reviews
Permit Number - TR-UTL-1026-01702
Permit Status: In review
Permit Description: Cox to trench 18', bore 1031' and new attach 2202' for catv commercial business tie.
PERMIT FOR WORK ONLY WITH CITY OF TUCSON RIGHT OF WAY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/01/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01702
Permit Status: In review
Permit Description: Cox to trench 18', bore 1031' and new attach 2202' for catv commercial business tie.
PERMIT FOR WORK ONLY WITH CITY OF TUCSON RIGHT OF WAY
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 10/08/2026 | Bus Stop/Route |
| 10/08/2026 | City of Tucson Right of Way Only |
| 10/08/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/08/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/08/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/03/2026 | All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift. |
| 11/03/2026 | Potholing operations shall be conducted in a manner that maintains public safety and minimizes impacts on traffic. All excavations shall be properly protected, backfilled, and restored upon completion. The permittee shall be responsible for repairing any settlement or pavement failure resulting from potholing activities at no cost to the City. |
| 11/03/2026 | The sidewalk shall remain open and ADA compliant at all times during construction. Crew- or worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented before the sidewalk is closed. |