Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
10/28/2025
Applicant:
Matt Johnson
Description:
Excavating a 3' x 7' trench at 7020 E 22nd St #104 to replace gas service in ROW in dirt. Trench will be located appx 163' north of south P/L.

Permit Reviews

Permit Number - TR-UTL-1025-01879
Permit Status: Complete
Permit Description: Excavating a 3' x 7' trench at 7020 E 22nd St #104 to replace gas service in ROW in dirt. Trench will be located appx 163' north of south P/L.
Start Date Submittal Complete Date Status  
10/29/2025 RIGHT-OF-WAY REVIEW v.1 10/29/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01879
Permit Status: Complete
Permit Description: Excavating a 3' x 7' trench at 7020 E 22nd St #104 to replace gas service in ROW in dirt. Trench will be located appx 163' north of south P/L.
Total Outstanding Activity Conditions - 3
Date Name
10/29/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
10/29/2025 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
10/29/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1025-01879
Permit Description: Excavating a 3' x 7' trench at 7020 E 22nd St #104 to replace gas service in ROW in dirt. Trench will be located appx 163' north of south P/L.
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/31/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Matt from Hal Hayes construction over the phone and he informed me that work is tentatively scheduled to begin on Tuesday November 4th
12/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete
12/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
12/02/2025 TRSP - ROW - Final Passed Work is complete