Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
29 N TUCSON BL
Address NEW:
29 N TUCSON BL
Apply Date:
10/21/2025
Applicant:
Description:
wo3138501 29 n tucson bl 14-14-08 sw replace service front east side of lot in asphalt 6LF/sc

Permit Reviews

Permit Number - TR-UTL-1025-01832
Permit Status: Needs resubmittal
Permit Description: wo3138501 29 n tucson bl 14-14-08 sw replace service front east side of lot in asphalt 6LF/sc
Start Date Submittal Complete Date Status  
10/22/2025 RIGHT-OF-WAY REVIEW v.1 10/22/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01832
Permit Status: Needs resubmittal
Permit Description: wo3138501 29 n tucson bl 14-14-08 sw replace service front east side of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 3
Date Name
10/22/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
10/22/2025 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
10/22/2025 Traffic control set-up approved between 9AM - 3:30PM