Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
175 E FORT LOWELL RD
Apply Date:
10/21/2025
Applicant:
John Rhodes
Description:
Place 2670' of new strand over 11 spans, lash 2670' of 48ct fiber over 11 spans. Bore 155' of 2" conduit at a depth of 3'. Run 155' of 48ct fiber. on Fort Lowell between Estrella Ave and 1st Ave

Permit Reviews

Permit Number - TR-UTL-1025-01825
Permit Status: Inspections
Permit Description: Place 2670' of new strand over 11 spans, lash 2670' of 48ct fiber over 11 spans. Bore 155' of 2" conduit at a depth of 3'. Run 155' of 48ct fiber. on Fort Lowell between Estrella Ave and 1st Ave
Start Date Submittal Complete Date Status  
10/22/2025 RIGHT-OF-WAY REVIEW v.1 10/22/2025 APPROVED Review Details
10/24/2025 RIGHT-OF-WAY REVIEW v.1 10/27/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01825
Permit Status: Inspections
Permit Description: Place 2670' of new strand over 11 spans, lash 2670' of 48ct fiber over 11 spans. Bore 155' of 2" conduit at a depth of 3'. Run 155' of 48ct fiber. on Fort Lowell between Estrella Ave and 1st Ave
Total Outstanding Activity Conditions - 4
Date Name
10/22/2025 BUS STOP/ ROUTE
10/22/2025 PRE-CON/ SIDEWALK
10/22/2025 Traffic control set-up approved between 9AM - 3:30PM
10/22/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1025-01825
Permite Description: Place 2670' of new strand over 11 spans, lash 2670' of 48ct fiber over 11 spans. Bore 155' of 2" conduit at a depth of 3'. Run 155' of 48ct fiber. on Fort Lowell between Estrella Ave and 1st Ave
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/17/2025 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
12/17/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required
12/17/2025 TRSP - ROW - Final N/A Re-inspection required

Documents

File Name Document Type  
ENGINEERING_DRAFT 1_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
ENGINEERING_DRAFT 1_V1 APPROVED.PDF DOCUMENTS VIEW
TCP 1_V1 APPROVED.PDF DOCUMENTS VIEW