Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7797 S COBBLE HILL CT
Apply Date:
10/16/2025
Applicant:
Description:
wo3135421 7797 s cobble hill ct 15-15-19 sw service renewal front of lot in asphalt 8LF/sc

Permit Reviews

Permit Number - TR-UTL-1025-01806
Permit Status: Inspections
Permit Description: wo3135421 7797 s cobble hill ct 15-15-19 sw service renewal front of lot in asphalt 8LF/sc
Start Date Submittal Complete Date Status  
10/17/2025 RIGHT-OF-WAY REVIEW v.1 10/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01806
Permit Status: Inspections
Permit Description: wo3135421 7797 s cobble hill ct 15-15-19 sw service renewal front of lot in asphalt 8LF/sc
Total Outstanding Activity Conditions - 2
Date Name
10/17/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 25TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show.
10/17/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1025-01806
Permite Description: wo3135421 7797 s cobble hill ct 15-15-19 sw service renewal front of lot in asphalt 8LF/sc
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/20/2025 TRSP - ROW - Final N/A Re-inspection required Temporary paper repairs in place waiting on final paver repair

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1025-01806
Permit Description: wo3135421 7797 s cobble hill ct 15-15-19 sw service renewal front of lot in asphalt 8LF/sc
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete, waiting on final pavement repair
11/20/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete, but we are still waiting on final pavement repair

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW