Permit: TR-UTL-1025-01789
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3502 S PANTANO RD
Address NEW:
3502 S PANTANO RD
Apply Date:
10/13/2025
Applicant:
Desert Barricades LLC
Description:
WO T164898 - 3502 S Pantano. Replacing a transformer and replacing the primary cable
Permit Reviews
Permit Number - TR-UTL-1025-01789
Permit Status: Complete
Permit Description: WO T164898 - 3502 S Pantano. Replacing a transformer and replacing the primary cable
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/13/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/14/2025 | REQUIRES RESUBMIT |
| 10/16/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01789
Permit Status: Complete
Permit Description: WO T164898 - 3502 S Pantano. Replacing a transformer and replacing the primary cable
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01789
Permit Description: WO T164898 - 3502 S Pantano. Replacing a transformer and replacing the primary cable
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Tucson Electric Power over the phone for a preconstruction meeting. He informed me that work would begin tomorrow that’s Tuesday, October 28. | |
| 11/06/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 11/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 11/06/2025 | TRSP - ROW - Final | Passed | Work is complete |