Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7991 E WRIGHTSTOWN RD
Apply Date:
10/13/2025
Applicant:
John Rhodes
Description:
trench along proposed path for 75ft at a depth of 36inches. replace .625 cable from existing peds.

Permit Reviews

Permit Number - TR-UTL-1025-01788
Permit Status: Complete
Permit Description: trench along proposed path for 75ft at a depth of 36inches. replace .625 cable from existing peds.
Start Date Submittal Complete Date Status  
10/13/2025 RIGHT-OF-WAY REVIEW v.1 10/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01788
Permit Status: Complete
Permit Description: trench along proposed path for 75ft at a depth of 36inches. replace .625 cable from existing peds.
Total Outstanding Activity Conditions - 4
Date Name
10/14/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
10/14/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
10/14/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
10/14/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1025-01788
Permit Description: trench along proposed path for 75ft at a depth of 36inches. replace .625 cable from existing peds.
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
12/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/02/2025 TRSP - ROW - Final Passed